Sign off a design check
Calculations checked, comments closed and the certificate issued.
- Agree the check category
- Send calculations and drawings to the checker
- Review the calculations
- Log the checker's comments
- Close the comments
- Issue the check certificate (Checking engineer signs off). Most people forget this: Work built before the certificate is issued is a big risk
- Send the certificate to the client