Sign off a design check

Calculations checked, comments closed and the certificate issued.

  1. Agree the check category
  2. Send calculations and drawings to the checker
  3. Review the calculations
  4. Log the checker's comments
  5. Close the comments
  6. Issue the check certificate (Checking engineer signs off). Most people forget this: Work built before the certificate is issued is a big risk
  7. Send the certificate to the client

All recipes